Transportation, Tubing, and Margaritas

Yes, I'm alive!

Thursday, November 16, 2006

Opinions on Atlanta's Transportation Future in AJC

From the November 3rd Edition of the Atlanta Journal Constitution:

Urban planners say traffic congestion can't be eliminated simply by building roads. Atlanta's decades-long love affair with more and bigger highways has proved them correct. Wider highways increase capacity, which encourages sprawl, generating more traffic, and pretty soon those wider highways are clogged with traffic.

The study, Commuting in America III, by the Transportation Research Board comes as state and federal transportation agencies are considering a slate of major new projects intended to alleviate traffic congestion in metro Atlanta, such as expanding I-75 and I-575 in Cobb and Cherokee counties. Several scenarios are proposed for the project, some of which include positive elements such as increased use of bus rapid transit and new transit stations to serve these buses.

But one serious failing in the expansion proposal is the lack of rail-based projects. The stability provided by rail infrastructure can fundamentally change metro Atlanta's land-use patterns, allowing the region to proactively guide growth, rather than react to it. As long as Atlanta builds roads rather than rails, we will always be a step, or more, behind our transportation problems.

Even more troubling, however, is that the scenarios call for adding as many as eight lanes to I-75, creating 23-lane-wide portions of concrete —- wider than the length of a football field.


These new lanes will do little or nothing to reduce the number of vehicles on the road. And in a twist that shows just how foolish our transportation planning has become, the new lanes will end at the junction of I-75 and I-285, one of the worst traffic bottlenecks in the country, as the commuting study identified. All the vehicles in the new lanes will have to rejoin the existing lanes, making the bottleneck even worse. Further, the proposal also calls for between four and six new lanes elsewhere in the 75/575 project area. None of these additional lanes will solve the congestion problem. They will just relocate it, and probably make it worse.

The public will have a critical opportunity to weigh in on the I-75/ I-575 proposal when the draft environmental study is released this year.

# of hits for saving the world


Click Here